Waste Management Services

Vista Consulting Engineers provides comprehensive, life-cycle engineering solutions for solid waste management facilities across the globe. From state-of-the-art landfill design to closure, restoration, and environmental compliance, our nearly 50 years of experience ensures safe, efficient, and sustainable waste management outcomes.

New Facility Design & Major Expansion

  • Mamminasata Regional Solid Waste Disposal Facility, Indonesia: Delivered full detailed design (300+ drawings and specifications to Australian standards) for a major waste complex for AusAID, including a landfill, leachate treatment plant, and waste sorting/composting plant.

  • Xingfeng Municipal Solid Waste Management Facility, China: Provided full design and construction supervision for a facility with a phased capacity of ~20 million tonnes. A key feature was the design of a 30,000m³ leachate storage lagoon to manage seasonal flow.

  • Emelle Hazardous Waste Landfill, USA: Designed over fifteen disposal units for one of North America's largest hazardous waste landfills, featuring double-composite liners and sophisticated containment systems.

  • Chestnut Ridge Landfill, USA: Engineered a 2 million cubic metre vertical and horizontal expansion in challenging karst terrain, involving a 30-meter high reinforced-soil embankment.

  • Kovic MSW Management Facility, Sweden: Designed a 3 million cubic metre expansion in a steep-sided valley, including groundwater isolation structures and leachate systems over soft soils.

Landfill Closure, Restoration & Environmental Remediation

  • Shuen Wan Landfill Restoration, Hong Kong SAR: Led the pioneering first landfill restoration project in Hong Kong, a 55-hectare site with 18 million tonnes of waste, from EIA and capping to gas management and monitoring.

  • Urban Landfills Restoration, Hong Kong SAR: Managed the design/construct/operate contract for the restoration of five legacy landfill sites across Hong Kong.

  • Miga Hill Landfill, Indonesia: Developed the closure concept for a landfill in a high-seismic zone and karst terrain, employing advanced slope stability back-analysis.

Copyright 2012 Vista Consulting Engineers Limited. All rights reserved.

Web Hosting by Turbify

Vista Consulting Engineers Limited
17th Floor, Unit C, Skyline Tower
18 Tong Mei Road, Mongkok, Hong Kong


ph: +852 3549 6346
fax: +852 3549 6348

leo.overmann@vista-engineers.com